News & Announcements

THE CITY HAS A LEAF COLLECTION SERVICE FOR ALL RESIDENTS

Once you have your leaves to the curb, CALL CITY HALLĀ 731-784-7782

Let them know you are in need of leaf pickup IF LEAVING A MESSAGE,

BE SURE TO LEAVE YOUR ADDRESS AND SOMEONE WILL BE OUT. THANK YOU!

 

The City of Three Way has now completed all phases of the Municipal Development Project that began in the Spring of 2009.


playarea

August 28, 2012, The Park and Recreation crew worked in preparation for the additional playground equipment to be installed in time for the September 22, 2012 festival.

In June of 2011, playground equipment was added at Pine Hill Park. Two play structures, one for ages 2-5 and another for ages 5-12, were installed. Two swing bays were also included in this project.


Phase II of the Municipal Development Project is complete

Pine Hill Parkpavilion-finishedlake7

This phase includes a city park with walking trail and pavilion. The walking trail has various routes, the outer most route being one-third mile. Decorative lighting is installed along the trail. The pavilion has restrooms, picnic tables, and adjoining grills. The lake at the rear of the park has a fountain. Park benches are placed at various intervals along the walking trail. Additional picnic tables are located at several locations inside the park. A paved drive from Three Way Lane leads to a circle drive with parking.


Phase I of the Municipal development project is complete

equipment-building3

This phase includes a 60 ft x 60 ft equipment building to house the city’s street and maintenance trucks, tractors, mowers, and other equipment. The building is centered in a fenced maintenance yard. The entrance to the yard connects to Three Way Lane.